Application under Part 1/Part 1A for Connection/Removal
Distributed generation with capacity of <= 10kW
Distributed generation application type
New
Additional DG equipment with exporting capability
Additional DG equipment with no exporting capability (passive)
Decreasing DG equipment output capacity
Replacing existing DG equipment with new system (same output)
Replacing existing DG equipment with new system (different output)
Total removal of DG equipment from site