Network Tasman
Nelson Electricity

Network Connection Application Form

IMPORTANT

  • Five (5) working days must be allowed to process this application
  • To be completed by the person accepting responsibility for any costs incurred by this application
  • Where necessary, this installation must comply with AS/NZS 3000, the current Electricity Regulations, the Network Tasman / Nelson Electricity Distributions Code and must be certified and inspected prior to livening or re-livening
  • Once this NCA is approved by Network Tasman / Nelson Electricity it is then your responsibility to arrange a time and date with your nominated Accredited Contractor for Connection, to visit site and complete the works
  • Easement Route: All necessary electrical easements must be registered prior to NCA approval
  • This application may incur costs from any of the following: Network Tasman / Nelson Electricity; The nominated Accredited Contractor for Connection; The Energy Retailer; An Auditor; Others. It is your responsibility to determine these costs from the respective companies prior to proceeding with this application
  • The Electrician should not install the mains cable until the connection point and phasing have been approved by Network Tasman / Nelson Electricity
  • Network Tasman / Nelson Electricity recommend a meter box size of 600H x 400W x 200D to accommodate a typical meter depth of 115mm

NETWORK

Please select the applicable electricity network:
Network

APPLICATION TYPE

Please select one of the following options: